logo
Welcome Guest! To enable all features please Login or Register.

Notification

Icon
Error

Login


Options
View
Go to last post Go to first unread
qizhen0809  
#1 Posted : Friday, November 11, 2016 6:54:21 AM(UTC)
qizhen0809

Rank: Advanced Member

Groups: Registered
Joined: 7/18/2016(UTC)
Posts: 205
Bhutan
Location: asfasdsa

keel connected pieces

welding parts of anti-rust paint brushing. Fifth, the installation of light steel keel main keel 1, equipped with hanging rod nut. 2, in the main keel on the installation of hanging pieces. 3, the assembly will be a good hanging the main keel, according to sub-file line position so that the hanging pieces into the appropriate boom bolts, screw nuts.

connecting the main keel connected pieces, pull the line to adjust the elevation, from the arch and straight. 5, the installation of additional holes in the main keel, according to Atlas corresponding node structure, set the connection card firmware. 6, nailing the edge of the keel,

fixed with the nail. When the design is not required, the nail spacing is 1000 mm. 6, the installation of the main keel will be embedded in the end of steel bends into a circular hook, wear 8 # galvanized wire or with,bolts will be the main keel fixed,
Cheap Price Wpc Fence,Corrosion Resistant Outdoor Deck Suppliers
millboard decking perth prices
plastic picket fence for indoors
decking pvc decking portland oregon
Users browsing this topic
Guest (2)
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.