logo
Welcome Guest! To enable all features please Login or Register.

Notification

Icon
Error

Login


Options
View
Go to last post Go to first unread
swpt_SvN6BL3Z  
#1 Posted : Monday, September 07, 2020 1:36:56 PM(UTC)
swpt_SvN6BL3Z

Rank: Newbie

Groups: Registered
Joined: 9/4/2020(UTC)
Posts: 5

?1. 45 seconds quick installation without any tools2. 3-phase circuit?preset in the trucking rail, individually controll the lamps?3. 2 Dimming version :?0-10V or DALI?4. High brightness?160lm/W two version?5. Build in?Microwave sensor & daylight sensor?6. With?X, L and T?standard Module Node Connectors?7. Mounting options :?Chain or cord, surface mounted?8. A wide range of optics from?30 to 120degree?disctribution as well as?double asymmetric?distribution?9. Trunking rail as standard with?5,7 or 11-core through-wiring with 2.5mm2 cable cross-section10. The maximum current is 16A,allowing 150 lamps of 150cm 60w in one serial11. Separate power supplies,dimming or emergency supply can be integrated12. Electrical feed possible in central or end area of a trunking rail arrangement via special trunking rail element13. Simple mounting of trunking rail elements with pre-assembled connectors with integral plug-in systemDatahseet (led model ):Datasheet (LED Trunking? Rail ) :Q1. Can I have a sample order for led linear ?trunking system ?A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.Q2. What about the lead time?A:Sample needs 3-5 working days, mass production time needs 12-15 working days??.Q3. Do you have any MOQ limit for led light order?A: No ?MOQ, 1pc for sample checking is available http://www.recoluxledlighting.c...t-lighting-fixtures.html
Users browsing this topic
Guest (2)
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.