logo
Welcome Guest! To enable all features please Login or Register.

Notification

Icon
Error

Login


Options
View
Go to last post Go to first unread
xzbbvfvbh  
#1 Posted : Wednesday, April 17, 2019 1:30:22 PM(UTC)
xzbbvfvbh

Rank: Advanced Member

Groups: Registered
Joined: 11/14/2018(UTC)
Posts: 57
China
Location: zhengzhou

Two methods of installing PVC sports flooring

Mobile installation:

The floor and the floor are bonded together by a special connecting belt provided by the manufacturer. The floor and the prefabricated interlocking running track are not bonded. The sc-zsfloor sports floor manufacturer can roll up or remove the PVC sports floor at will, which is convenient for movement.

Second, fixed installation:

1. Semi-fixed type: special double-sided tape, which is bonded with the special double-sided tape of the manufacturer's matching between the floor and the floor. At the same time, the floor and the floor are also bonded together, which can effectively prevent the floor from happening due to strenuous exercise. Moving, slitting, and making it easy to move the entire site in the future.

2. Partial bonding: 20 cm of adhesive bonding on the ground with the edge of the floor as the reference.

3. Fully glued: all glued on the ground to be laid.

[Installation of PVC sports flooring to the grassroots level]:

The procurement futsal court of the construction must be clean, long-lasting and clean, with high flatness and no ****s. The concrete floor moisture content cannot exceed 2.5%. The moisture content of the gypsum floor shall not exceed 0.5%. Before the floor is laid. After the floor is dusted, PVC sports flooring can be laid. If the original ground is uneven, it can also construct self-leveling of about 2mm. If it is non-absorbent ground such as mineral base, stone, ceramic tile, etc., it can be directly paved.

[Note]: If it is a wet floor such as a basement, the floor must be waterproof to isolate water vapor.

[PVC floor installation steps]:

1. The ground should be laid flat and clean.

2. PVC sports flooring must be laid out in advance for laying on the ground for more than 24 hours before laying, and the site temperature should not be lower than 15 °C. After the floor is restored, the ends should be kept 5 cm more. Before pasting, roll the unfolded floor back about halfway, then scrape the glue – starting from the middle – the glue is applied with a toothed scraper.

3. Arrange in the order of the number of the floor, align and merge, pay attention to the alignment of the site line during the paving process.

4. Open the adjacent two pieces of removable synthesis prefabricated interlocking running track along the joint, place the special connecting belt of the manufacturer on the lower side of the joint, brush the glue on the surface of the joint, first stick one of the plates to the half of the joint, then Stick the other half to the remaining connecting strips and tighten the gap.

5. It is recommended to use water-soluble glue that is harmless to the human body for construction. When the floor is pasted, use the cork block to squeeze the floor surface from the middle to the ends so that it is flat without leaving air bubbles, and the roller is completely rolled flat.

6. After the floor is paved, it should be slotted and welded. After welding, the wire should be leveled.
Users browsing this topic
Guest (2)
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.