Stainless steel tee installation instructions 1, before installation, you must carefully check the various standards of stainless steel links, the diameter is in line with the requirements, to eliminate defects caused by the transport process, and eliminate the stainless steel three links of dirt, do the preparation before installation, everything is ready.
Stainless Steel Sheet Price In China 2, the installation, the stainless steel links can be connected directly installed in the pipeline, according to the location of the installation. Under normal circumstances, can be installed in any position on the pipeline, but need to facilitate the operation of maintenance, pay attention to the flow of stainless steel three-way flow should be vertical valve flap to the following flow, stainless steel three links can only be installed horizontally. Stainless steel tee in the installation to pay attention to sealing, to prevent leakage, affecting the normal operation of the pipeline.
10 Inch Stainless Steel Pipe Cost 3, stainless steel tee ball valve, closing valve, gate valve used only for full or full closure, do not allow to do to adjust the flow, so as to avoid erosion of the sealing surface to accelerate wear and tear. Gate valve and upper thread cut-off valve with reverse seal device, the hand wheel to the top position screw tight, you can prevent leakage of media from the filler.
low price 316 stainless steel bar price 4, stainless steel three-way hand wheel, do not use leverage or other tools, so as not to damage the valve. Turn the handwheel clockwise to turn off, otherwise turn it on. Ah ah to use reasonable to ensure the correct use of methods and means
stainless steel hollow pipe sizes weightEdited by user Thursday, December 29, 2016 7:22:36 AM(UTC)
| Reason: Not specified