logo
Welcome Guest! To enable all features please Login or Register.

Notification

Icon
Error

Login


Options
View
Go to last post Go to first unread
swpt_SwESAnL8  
#1 Posted : Thursday, October 01, 2020 9:32:04 PM(UTC)
swpt_SwESAnL8

Rank: Advanced Member

Groups: Registered
Joined: 9/10/2020(UTC)
Posts: 76

Hydraulic pipe installation specifications

1. Check whether the whole casing is correct and matched according to relevant technical documents.

2. Check the appearance of the pipe before installation, whether the joints and thread threads are damaged, whether the seal ring is damaged and the position is correct, whether there are foreign objects in the pipe, and whether they are clean.

3. Pre-install the pipe joints according to the requirements of the technical documents. During the installation, pay attention to the alignment of the joints and the pipes, and no deflection or bending is allowed. Note: If there is deflection or bending during the tightening process, you must immediately stop the tightening and reverse the rotation to prevent damage to the threads and seals.

4. Adjust the pipeline to avoid twisting or bending of the pipeline.

5. Tighten the pipe joint according to the specified torque value. If no torque is required, it is necessary to ensure sufficient tightening force to make the joints tightly combined. Use pipe clamps to secure the tubing. 6. Add the corresponding filling medium and perform a compression test to check whether there is a leak in https://www.dtsanyparts.com/slew...-ppc-sany-excavator.html
Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.