Since December of 2019, many countries are suffering New Coronavirus. In the beginning, it spreads fast and Chinese Government decides to build Prefab Container Hospitals to cure these patients. The fact shows the Container Hospitals are in good function during the Virus War. The first step is to confirm and detect if the people has initial character of in CoronaVirus. So many Detection Container Rooms are needed. Our factory is able to supply the Container Detection Rooms.
Mobile Container Detection Room Specification:
WALL & ROOF
1 Wall panel Wall panel 60 mm thickness EPS sandwich panel with 0.5mm thickness white-grey color steel skin, 16kg/m3 density insulation
Interior partition wall panel 60 mm thickness EPS sandwich panel with 0.5mm thickness white-grey color steel skin, 16kg/m3 density insulation
Toilet partition board Melamine board with accessaries.
2 Roof Interior top board 60 mm thickness EPS sandwich panel with 0.5mm thickness white-grey color steel skin, 16kg/m3 density insulation
Insulation part in top 75mm Rock Wool Insulation
Exterior top board 0.5mm thickness color steel
Roof water treatment 50mm Dia PVC pipe for roof water system.
STEEL FRAME
3 Steel frame Column 3.0mm Galvanized steel bending + painting finishing
Foundation main beam 3.0mm steel bending main beam + painting finishing
Foundation secondary beam 80x40mm steel rectangular tube + painting finishing
Roof framework 3.0mm steel bending main beam + painting finishing
Roof secondary beam 40x40mm steel section + painting finishing
Corner fitting special for container house,ISO standard
Skirting line for decorate wall edged PVC skirting line
FLOOR
4 Floor Floor base 18mm Fiber cement board
Floor finishing 1.8mm PVC floor
5 Door & Window Door 840x2040mm white color security door with stainless steel lock
window wrap page 900x1200mm & 600x600 white color Aluminum Alloy Sliding windows with double glazed glass 5/9/5mm & fly screen.
Window wrap page aluminum alloy
ACCESSARIES
6 Accessories Accessories bolt, screw, glass glue, connecting part, basic tools for assembling
Electrical material components electric distribution board,single phase circuit breaker , sockets, switches, lights, wire under customers' country standard
Facilities Shower, towel rack; toilet, toilet paper holder; urinals; hand basin, soap holder; Exhaust fan.
Mobile Container Detection Room Technical info:
1. Container lifetime: 30 years.
2. One standard unit 20ft Prefab Container House weight: 2 tons.
3. Level: the containers are stackable and could be stacked for 3 levels.
4. Assemble time: in general, 3 workers could assemble 4 units per day.
5. Assemble guidance: available. We give detailed Video and brochure for guiding assembling. Meanwhile, our factory is able to arrange worker or Engineer to client’s site guide assembling. But client will in charge of the cost.
6. Wind resistance: Grade 11 (wind speed≤120km/h)
7. Earthquake resistance: Grade 7
8. Lve load capacity of roofing: 0.6kn/m2
9. Snow load capacity of roofing: 0.6kn/m2
10. External and internal wall heat transmission coefficient: 0.35Kcal/m2hc
https://www.ftprefabhouse.com/co...iner-detection-room.html